Site
It begins with the land.
Feasibility, land due diligence, the technical brief.
Envelope
The buildable envelope.
Setbacks, height limits, what the plot allows.
Massing
Form, before detail.
Volume and orientation, tested early.
Structure
Slabs, columns, the core.
The skeleton that carries everything above.
Coordination
Every system, in concert.
MEP coordinated before a single wall is built.
Construction
Built under control.
Progress and quality enforced, floor by floor.
Delivery
Checked against the brief.
Handed over, inspected, defects closed.
Control
Full technical control.
First line to final handover. — INGEX