Preliminary MEP Load Estimator
Pre-design cooling (TR) and electrical (kW) load estimates for UAE buildings — and the ground-floor area you'll surrender to DEWA for substations.
DEWA capacity reservations and District Cooling (Empower, Tabreed) connections take months and bind your scheme to specific load assumptions. Check the numbers before the architect drafts the first plan.
MEP loads are the #1 cause of bloated budgets and lost ground floor.
Contractors and MEP consultants routinely over-design loads to inflate equipment procurement margins. Through rigorous Value Engineering, diversity-factor optimisation and load challenge sessions, INGEX shrinks plant-room footprints and cuts DEWA / District Cooling connection fees — often double digits.
Request MEP optimisation audit →Get a project-specific MEP load audit.
We benchmark your current loads against UAE peer projects, challenge over-conservative assumptions, and quantify the reduction in DEWA / Empower / Tabreed connection fees achievable through Value Engineering. Held under NDA.
Preliminary benchmarks for early feasibility only. Actual MEP loads must be calculated against final architectural layouts, thermal modelling, occupancy schedules and DEWA / DDA / Trakhees authority guidelines. Contact INGEX for a precise engineering audit.